What it produces
PM work orders released on time with kits and procedures attached, and closed with real readings that set the next due point.
the scheduled inspection and servicing of equipment on time or usage intervals to prevent breakdowns before they happen
PM work orders released on time with kits and procedures attached, and closed with real readings that set the next due point.
The maintenance and reliability planner, with production supervisors, operations, EHS, the warehouse and purchasing.
Daily releases, weekly planning.
Calendar PMs are easy. Usage PMs are not. The press that ran three shifts needs its PM before the one that ran one, but the counter lives on an HMI, an IoT dashboard or a dial someone photographs. The planner copies readings into a spreadsheet, decides what is due and releases orders by hand. Kits come up short. Production will not give up the press on Tuesday.
Closing leaks too. Technicians write on paper. Labor, parts and readings reach the ERP days later, if ever, so the meter baseline never resets and the next PM comes due at the wrong count. And a PM released without its lockout procedure is missing its most important attachment.
The agent reads machine dashboards and exports but never writes to machine controls. It attaches the current lockout procedure from your document library and carries CMMS labor and parts into the ERP when maintenance runs separately. Product →
12 steps · 5 actions · 6 decisions · 1 human reviews
Action Decision Human review Select a step in the flowchart to jump to it.
Action · Agent
Read meters from HMI or IoT exports, or from photos of mechanical counters.
Decision · Agent
A reading lower than the last one, or higher than the machine could possibly have run, goes to review.
Decision · Agent
Due when the calendar date falls inside the horizon or usage reaches the interval, whichever comes first. Skip if an open PM already exists.
Action · Agent
Generate the work order with tasks, estimated hours and kit.
Decision · Agent
Assets with hazardous energy must carry their lockout procedure ID. Missing means stop.
Decision · Agent
Reserve kit parts on hand. Any shortfall creates a requisition and flags the order.
Decision · Agent
The date must fit a downtime window on the production calendar. Conflicts go to the planner.
Human review · Planner
The planner and production supervisor agree the date.
Action · Agent
Release the order and notify the assigned technician.
Action · Agent
Read the completed checklist, from a mobile form or scanned paper, and check every reading against its limits.
Decision · Agent
Any reading out of limits opens a corrective work order linked to the PM.
Action · Agent
Enter labor and parts, record readings, close the order, reset the meter and confirm the next due point moved.
✓ Done
See it done in the Gallery
A second deferral in a row goes to the operations manager before it saves.
Needs data
The operator or technician is asked by name, with the source photo attached.
Released with the annual inspection scheduled as its own PM; EHS is told.
Needs a decision
Requisition created, order flagged a day ahead.
Planner and supervisor decide.
Needs parts
Reassigned before release.
Corrected before closure and the kit flagged for review.
The planner defers with a reason and new date. Two deferrals in a row escalate automatically.
It reads what a person can see: an HMI, a dashboard, an export or a dial photo. Where a clean data feed exists, it uses that.
It keeps the procedure ID on every relevant order and schedules the annual procedure inspection. An authorized person still does the inspection.
Even better. The agent reads the submitted form instead of a scan, and everything after is the same.
No prompts. No babysitting. No Integrations.