Project Management & Document Control (38)
about 183,746 hrs/yr
- RFI routing (Daily, about 5,375 hrs/yr) Each issued RFI goes to the responsible architect or engineer, with ball-in-court set to that reviewer and the distribution list chosen by discipline so affected trades see the question.
- RFI response tracking (Daily, about 5,375 hrs/yr) The project engineer tracks each RFI's status, days open, and official response, distributes answers to affected subcontractors, and notes whether an answer changes cost or schedule.
- RFI overdue follow-up (Daily, about 5,375 hrs/yr) RFIs past their contractual due date get chased with the design team, because unanswered questions stall field work and the dated follow-ups later support delay claims.
- RFI cost/schedule impact evaluation (Daily, about 5,375 hrs/yr) When an RFI answer arrives, the PM judges whether it changes scope, cost, or schedule, and if so opens a potential change order and notifies the owner inside the contract notice period.
- Submittal routing (Daily, about 5,375 hrs/yr) Packages route through the contractor's internal review and then to the architect and consultants, with due dates and ball-in-court tracked in the submittal workflow of the project platform.
- Submittal resubmission (Daily, about 5,375 hrs/yr) Rejected or revise-and-resubmit submittals go back to the subcontractor for correction and are tracked as new revisions until the architect returns an acceptable action.
- Submittal overdue follow-up (Daily, about 5,375 hrs/yr) Late submittals, whether held by a subcontractor or a reviewer, eat into fabrication lead time.
- Submittal-to-procurement handoff (Daily, about 5,375 hrs/yr) Approval of a submittal starts the fabrication clock, so purchasing is told immediately to release the order and the procurement log records the release date.
- Drawing upload (Daily, about 5,375 hrs/yr) New drawing sets and revisions from the design team are uploaded to Procore or Autodesk Construction Cloud, with sheet number, revision number, and issue date recorded for every sheet.
- Drawing revision distribution (Daily, about 5,375 hrs/yr) When revised sheets are issued, the team tells superintendents and affected subcontractors which sheets changed and what changed, usually by bulletin or revision clouds.
- Superseded drawing control (Daily, about 5,375 hrs/yr) Old revisions must be marked superseded so nobody builds from an outdated sheet, both in the project platform's current set and on printed field sets.
- Field sketch management (Daily, about 5,375 hrs/yr) Sketches and clarifications issued in the field or by the architect are logged, linked to the drawings they modify, and tracked until they appear in the next formal revision.
- Meeting agenda preparation (Daily, about 5,375 hrs/yr) Before each owner-architect-contractor or subcontractor meeting, the PM builds the agenda from open items, RFIs, submittals, schedule issues, and pending change orders.
- Meeting minutes (Daily, about 5,375 hrs/yr) Minutes record attendees, discussion, decisions, and action items with owners and due dates, and they are distributed within the agreed period after each meeting.
- Action item tracking (Daily, about 5,375 hrs/yr) Action items from project meetings are tracked to closure with owner, due date, and status, carried from meeting to meeting until each one is resolved.
- Owner meeting package (Daily, about 5,375 hrs/yr) Before owner meetings, the PM prepares a package with schedule update, cost and change summary, RFI and submittal logs, safety statistics, and the three-week look-ahead.
- Weekly project report (Daily, about 5,375 hrs/yr) The weekly report summarizes progress, manpower, weather, issues, schedule status, and upcoming work for company leadership and, on many jobs, for the owner.
- Correspondence log (Daily, about 5,375 hrs/yr) Every formal letter and notice to or from the owner, architect, and subcontractors is logged with date, sender, subject, and any response deadline it creates.
- Document distribution (Daily, about 5,375 hrs/yr) Contract documents, revisions, and notices are sent to the correct distribution list, and proof of delivery is kept as part of the project record.
- Photo log (Daily, about 5,375 hrs/yr) Progress photos are uploaded, dated, labeled by location and trade, and linked to daily logs, RFIs, or issues so the photo record supports claims and closeout.
- Issue log (Daily, about 5,375 hrs/yr) Open project issues, from design conflicts to site access problems, are logged with owner, priority, and due date, and reviewed each week until they close.
- Decision log (Daily, about 5,375 hrs/yr) Decisions by the owner, design team, or contractor are recorded with date, source document, and reference, so later disputes have a clear, dated record.
- Constraint log (Daily, about 5,375 hrs/yr) Constraints that block work, such as missing information, materials, permits, or access, are logged by activity and must clear before the planned start date.
- Permit tracking (Daily, about 5,375 hrs/yr) Permit status, inspection results, and expiration dates are tracked for every permit, and renewals are filed before a lapse can stop work on site.
- Inspection request coordination (Daily, about 5,375 hrs/yr) Building department and special inspections are requested ahead through agency portals or by phone, and each result is recorded against the permit and the work area.
- Design coordination issue tracking (Daily, about 5,375 hrs/yr) Conflicts between architectural, structural, and MEP designs are logged with sheets and disciplines and tracked to resolution with the design team.
- BIM coordination issue management (Daily, about 5,375 hrs/yr) Model coordination issues from Navisworks or other BIM tools are tracked by level, zone, and trade, assigned for resolution, and reviewed in weekly coordination meetings.
- Clash resolution tracking (Daily, about 5,375 hrs/yr) Each clash in the federated model is tracked until the responsible trade updates its model and the next clash test comes back clear for that location.
- Architect supplemental instruction processing (Daily, about 5,375 hrs/yr) Architect's supplemental instructions clarify or change the design without a stated cost change.
- Field directive processing (Daily, about 5,375 hrs/yr) Field directives and construction change directives order work before the price is agreed.
- Contractual correspondence (Daily, about 5,375 hrs/yr) Formal letters on notices, claims, and disputes are drafted, reviewed, and delivered with proof of delivery by the method the contract specifies.
- Delay notice tracking (Daily, about 5,375 hrs/yr) Most contracts require written notice of delay within a set period.
- Schedule impact notice (Daily, about 5,375 hrs/yr) When an event affects the schedule, the contractor submits a notice listing impacted activities and a preliminary time impact analysis prepared in P6 or MS Project.
- Daily document filing (Daily, about 5,375 hrs/yr) Every day, emails, reports, photos, and documents are filed into the correct project folders so the job record stays complete and searchable for disputes and closeout.
- Submittal review tracking (Daily / Weekly, about 546 hrs/yr) The project engineer tracks each submittal's returned action, whether approved, approved as noted, revise and resubmit, or rejected, and returns the reviewed documents to the subcontractor.
- RFI creation (Per event / project, about 150 hrs/yr) A field or design question comes up and the project engineer writes an RFI in Procore or Autodesk Construction Cloud with the question, drawing and spec references, a proposed answer, and the required response date.
- Submittal package creation (Per event / project, about 150 hrs/yr) Subcontractor submittals are assembled into packages by spec section, with product data, shop drawings, or samples, and receive the contractor's review stamp before going to the architect.
- Transmittal creation (Per event / project, about 150 hrs/yr) Documents sent to the owner, architect, or subcontractors travel with a transmittal listing items, copies, purpose, and date, recorded in Procore or Autodesk Construction Cloud.